Modular Sheet Metal Cabinet Systems for Industrial Control Applications

Still deciding? Get samples of $ !
Order Sample

Product Description

i

Basic Specifications

Surface Treatment Electroplating
Machining Method Welding
Material SGCC
Quality Standard ISO9001
Process Laser Cutting, CNC Bending, Welding, Assembling
Finishing Anodized/Galvanized/Powder Coated/Sandblast, etc.
Tolerances 0.01mm
Drawing Format Step, STP, Gis, CAD, Pdf, Dwg, etc.
Logo Laser Engraving, Silk Printing, More Customized
Production Capacity 10000 Piece/ Month
P

Product Description

Modular Sheet Metal Cabinet Systems
Industrial Control Cabinet
Sheet Metal Fabrication
CNC Machining Parts
Metal Enclosure
Custom Racks
Industrial Enclosure
Precision laser-cut for micron-level accuracy
Premium steel for superior corrosion resistance
Fully customizable to your design specs
CNC-bent for unbeatable structural stability
Fast production with durable surface finish
F

Production Flow

Process Flow
01. Material Cutting

Cut premium steel/aluminum sheets into exact sizes via laser cutting or CNC shearing for burr-free edges.

02. Forming & Punching

CNC bending shapes the basic structure; precision punching creates mounting holes, wiring slots and ventilation openings.

03. Welding & Assembly

Weld components for structural rigidity, then assemble hinges, brackets and reinforcements.

04. Surface Finishing

Degrease, derust and phosphate the surface, followed by powder coating or galvanization for corrosion resistance.

05. Inspection & Packaging

Conduct dimensional, strength and finish checks; package qualified products with protective materials.

?

Frequently Asked Questions

Q1: What are the typical lead times for samples?
For sheet plate items, it takes about 5 days. CNC machining takes 3-5 days, while welding takes approximately 2 days. For items requiring moulds (casting & injection), the lead time is 15-20 days.
Q2: What shipment terms do you offer?
We provide flexible shipment terms including FOB, CIF, and DDP to accommodate various logistics needs.
Q3: Is there a minimum order quantity (MOQ)?
The minimum order quantity is low; we even support 1pc samples for quality inspection and testing.
Q4: How are products delivered and how long does it take?
We usually deliver via express services like DHL, UPS, FedEx, or TNT, which typically takes 3-5 days. Sea and air transportation options are also available.
Q5: How do you ensure product quality?
We conduct multiple inspection stages: accessories inspection, finished sample inspection, first article inspection, routing inspection, spot checks, and 100% inspection if requested.
Q6: Can you handle custom manufacturing demands?
Yes, our state-of-the-art processes including laser cutting and CNC machining ensure high precision for custom specifications, enhancing your project's market appeal.

Related Products