Commercial Chemical Dried Tunnel Oven Honeycomb Ceramic Drying Processing Microwave Industrial Equipment
| Item | Commercial Chemical Dried Tunnel Oven Honeycomb Ceramic Drying Processing Microwave Industrial Equipment |
| Microwave Power | 10 to 500 kW can be customized |
| Control | PLC |
| Feature | High efficiency microwave can heat materials with high dielectric constant to tens or even hundreds of degrees in a short time. Low cost, microwave is a kind of open and stop heat generation, no thermal inertia, can save a lot of energy. |
| Function | Drying, sterilization, puffing, defrost |
| Application | Food drying and sterilization, defrost meat and seafood, chemical drying, etc. |
| Certificate | CE/UL |
| Materials | 304 stainless steel |
| Size | 10 to 30 M can be customized |
| N.W | 2-10T |
| Warranty | Additional vulnerable parts will provide |
| Package | The industrial microwave custom equipment is packed in wooden cases with iron hoops. |
| Lead time | 30-45 days |
| Aftersales | Overseas engineers provide on-site service. |
1. Used for food drying, disinfection, nut processing, meat and seafood thawing.
2. Ideal for industrial processing and chemical drying.
3. Constructed with food-grade stainless steel for safety and reliability.
4. OEM & ODM services available.
Industrial microwave equipment is based on microwave technology and radio frequency technology, gradually replacing traditional drying, heating, and catalytic processes. It is widely used in food, chemical, ceramic, plasma, biomedicine, and other industries.
The product can receive energy evenly at the same time. The uniformity of the microwave system can reach COV≤0.40.
Microwave provides instantaneous start/stop heat generation without thermal inertia, saving significant energy compared to traditional methods.
Materials with high dielectric constants can be heated to hundreds of degrees in a very short duration.
Lead Time: 30-45 days.
Packaging Details: The industrial microwave custom equipment is packed in wooden cases with iron hoops.
Major Ports: Shenzhen / Zhongshan / Guangzhou / Zhuhai, China.
We are a professional and innovative team with independent research, development, and production capacity. We prioritize quality and service, adhering strictly to business ethics and contracts.
All products undergo rigorous testing at every stage, from initial production and packaging to pre-shipment inspections.
We accept Telegraphic Transfer (T/T), Letter of Credit (L/C), and Credit Cards. Please provide complete contact information including ZIP code and phone number when ordering to ensure smooth delivery.
After payment confirmation, goods are typically delivered within 2-5 working days. We coordinate with the best transportation companies to offer efficient routes for our customers.
General quotations are completed within 1 working day. For complex or customized equipment requiring specific molds, additional time may be needed to calculate accurate costs.
Our products come with a warranty period ranging from 3 months to 2 years, starting from the date of receipt. We provide on-site services via overseas engineers and paid repair services for artificial damage or fragile accessories.